A True Gem

When your business and reputation
demands the highest of standards,
nothing less than the best will do.

A PRIME ADDRESS
NEXT TO THE
PETRONAS TWIN TOWERS.

FLEXIBLE OFFICE SPACES
FOR MODERN ENTREPRENEURS
& PROFESSIONALS.

ELEVATING THIS GREEN MARK GOLD BUILDING'S STATURE IS ITS SUSTAINABLE AND ENERGY EFFICIENT DESIGN WITH
  • Energy savings of up to 20%
  • Water conservation up to 30%
  • High performance glazing windows for optimum indoor temperature
  • Sophisticated rainwater harvesting system
ELEVATING THIS GREEN MARK GOLD BUILDING'S STATURE IS ITS SUSTAINABLE AND ENERGY EFFICIENT DESIGN WITH
  • Energy savings of up to 20%
  • Water conservation up to 30%
  • High performance glazing windows for optimum indoor temperature
  • Sophisticated rainwater harvesting system

INNOVATE & STRATEGISE
IN THE SERVICED AND
FULLY-EQUIPPED MEETING SUITES

ENTERTAIN & NETWORK AT
THE ROOFTOP GARDEN COMPLETE
WITH EVENT FACILITIES.

TYPICAL
FLOOR PLAN

SPECIFICATIONS

STRUCTURE
Reinforced concrete structure
WALL
Masonry Wall / Reinforced Concrete Wall
ROOFING
Reinforced concrete roof slab
WINDOWS
Aluminium framed Window Panels and Facade Cladding System
DOORS
Approved fire-rated door
WALL FINISHES
Lift Lobby
Office
Stone / Cladding / Timber / Tiles / Plaster & Paint
Plaster & emulsion paint
FLOOR FINISHES
Lift Lobby
Office
Stone / Tiles
Concrete Finish
CEILING FINISHES
Lift Lobby
Office
Plaster board / Metal
Mineral fibre board
IRONMONGERY
Quality Lockset
WATER POINT (Capped off)
One point for unit above 1000sq.ft
DRAINAGE POINT (Capped off)
One point for unit above 1000sq.ft
POWER SUPPLY
32A, 3-phase DB for Purchaser's tapping for Unit Type A
40A, 3-phase DB for Purchaser's tapping for Unit Type B & C
60A, 3-phase DB for Purchaser's tapping for Unit Type D
AIRCOND POINT(fully wired to isolator in CU yard)
One point per unit
MULTIMEDIA PORT-2 core fibre wall socket
One point per unit

Typical Floor Plan

SPECIFICATIONS

STRUCTURE
Reinforced concrete structure
WALL
Masonry Wall /Reinforced Concrete Wall
ROOFING
Reinforced concrete roof slab
WINDOWS
Aluminium framed Window Panels and Facade Cladding System
DOORS
Approved fire-rated door
WALL FINISHES
Lift Lobby
Office
Stone / Cladding / Timber / Tiles / Plaster & Paint Plaster & emulsion paint
FLOOR FINISHES
Lift Lobby
Office
Stone / Tiles
Concrete Finish
CEILING FINISHES
Lift Lobby
Office
Plaster board / Metal
Mineral fibre board
IRONMONGERY
Quality Lockset
WATER POINT (Capped off)
One point for unit above 1000sq.ft
DRAINAGE POINT (Capped off)
One point for unit above 1000sq.ft
POWER SUPPLY
32A, 3-phase DB for Purchaser's tapping for Unit Type A
40A, 3-phase DB for Purchaser's tapping for Unit Type B & C
60A, 3-phase DB for Purchaser's tapping for Unit Type D
AIRCOND POINT(fully wired to isolator in CU yard)
One point per unit
MULTIMEDIA PORT-2 core fibre wall socket
One point per unit